Engineering Software Consultants
-->
This course presents theoretical concepts to model
and design coiled tubing wellbore cleanout operations. Both steady-state and
transient job design analysis are considered to optimize fuild selection and
pump flowrate schedule for an efficient cleanout.
This
short course can be taught either at client location or in the Houston area.
For additional information please contact us at (832) 295-1521 or
info@BTechSoft.com
Modeling
Coiled Tubing Wellbore Cleanout
Duration:
1 day
Who
Should Attend
Engineers
interested in design, planning and post-job analysis of coiled tubing wellbore
cleanouts.
What
You Will Learn
-
basics of fluid flow as applicable to coiled tubing wellbore cleanout
operations
-
typical wash
fluids and thier behavoir in coiled tubing cleanouts
-
"rules of thumb"
as well as scientifically based modeling techniques for job design
-
how to interpret
software results in the design and analysis of CT cleanout jobs
Course
Content
-
CT wellbore cleanout - introduction
-
optimization
variables - pump flowrates, fluid type, wiper trips
-
job constraints
- pump limitations, fracture pressure gradient
-
onshore and
offshore wells
-
modeling
techniques - particle settling, bed formation
-
steady state
analysis
-
transient job
design
-
field examples
Course Dates
This
course involves the use of computers and you are encouraged to bring your
laptops.
All course attendees will recieve a limited time license of our transient
wellbore flow simulator Tubeflow PIC as part of course material.
Notes