Engineering Software Consultants
-->
Download Brochure
TubeFlow PIC
Wellbore Intervention, Drilling, and Completions Software
TubeFlow
PIC is a transient flow simulator that can be used to model well intervention
operations with coiled tubing, drill string, and wireline. Applications that
can be modeled using TubeFlow PIC are listed below:
-
easy-to-use, quick calculations, sensitivity analysis
-
project configuration includes import/export/email features
-
English, SI, customizable units
-
non-Newtonian and multiphase flow modeling with heat transfer
-
multicomponent modeling and PVT properties through seamless integration with
FluidProps
-
graphical capabilities include save and compare options
-
reporting includes printing to MS Word and exporting data to MS Excel
Information
A full featured
evaluation version is available for 15 days. Click
here to download the demo. Please
contact us at +1 (832) 295-1521 or sales [at] BTechSoft [dot] com
for more information.
-
fresh water, produced water, seawater, steam
-
acid, single and
multiple salt brine
-
black oil, gas
mixtures
-
diesel, kerosene
-
foam, emulsion
Features
Fluid
Systems
In TubeFlow PIC, a list of pre-configured fluids
that commonly flow in wellbores is provided for convenience and ease of use.
Moreover, flexibility exists to create user-defined fluids for use in a
particular project. Fluid systems that can be modeled include, but are not
limited to:
Wellbore
Configuration
TubeFlow PIC provides a database of standard pipe
sizes to configure well tubulars, coiled tubing, and drill string.
Gravel
Pack
Design gravel pack operations for sand control
applications in poorly consolidated formations.
-
slurry volume requirements
-
alpha - beta
wave simulations
-
alternate path
technology - shunt tubes
-
beta - wave
breaker simulations
Wellbore
Cleanout
Model proppant cleanout or fill removal in wells
using coiled tubing.
-
minimum flowrate requirements
-
aid in fluid
selection
-
bed formation in
deviated wells
Torque
and Drag
Model force analysis on coiled tubing, drill
string, and wireline during well intervention.
-
buckling behavoir - sinusoidal, helical, and lockup limit
-
maximum set-down
weight, overpull
-
minimum tractor
pull
Tubing
Movement
Determine length of seals required by accounting
for tubing movement during production and injection operations.
-
pipe length and force changes
-
tubing stress
and packer-to-tubing force
-
maximum wireline
tool passage length
-
Velocity or siphon string design
-
nodal analysis
and multiphase flow
Fluid
Displacement
Model transient displacement of drilling mud with
completion brine and weighted spacers in wellbore cleaning operations.
-
acidizing, gravel packing, and workover operations
-
transient pump
pressure and bottomhole pressure variations
Drilling
Simulate drilling jobs with coiled tubing and
jointed pipe.
-
underbalanced and managed pressure drilling (UBD,MPD)
-
parasitic gas
injection
-
cuttings
transport ratio, slip velocity, bed formation
-
steam injection
-
black oil
production
-
multiple
reservoir zones - comingled production
-
coiled tubing
and drill string hydraulics - forward and reverse circulation
Hydraulics
Model production, injection, circulation
operations with or without reservoir interaction.
-
Well module - complex well configurations
-
survey
import/export